Applications

  • Tunneling Program Design Option 1
    This option is ideal for tunnels with small cross section. It suits for tunnels with the angle smaller than 18°. In this option, waste rock can be continuously put into the mine car, which immensely speeds up the loading process and improves the efficiency....
  • Tunneling Program Design Option 2
    This option is suitable for level tunnels with no cross-section limitation. This option takes advantage of fast-speed mucking loader and large-capacity mine shuttle car to make the waste loading and unloading process short....
  • Tunneling Program Design Option 3
    Crawler Mucking Loader + Second Conveying Belt + Third Conveying Belt. 1. This option is typical for excavating level tunnel or inclined shaft with an angle below 18°. 2. One good point of this option is that the second conveying belt can be drawn back and move backward together with the locomotive ...
  • Tunneling Excavating Design Option 4
    This option is suitable for level tunnel and inclined shaft with an angle smaller than 18°. The scrapper is 45m long and can move back about 35m together with the mucking loader during mine explosion. The main feature of this option is that the scraper is flexible. We can extend the scrapper’s troug...
  • Mine Tunneling Explosion Option 5
    This option is ideal for tunneling level lane in vertical shaft. In this option, it needs no conveyor belt, but it requires much more time and labor....
  • Coal Mine Tunnel Explosion Option 6
    This option is ideal for tunneling level lane in vertical shaft. In this option, it needs no conveyor belt, but it requires much more time and labor....
  • Tunnel Construction Option 7
    This option is ideal for inclined shaft with large gradient (≤ 30°). This option is designed for large-inclination tunneling, which is a long-time sore of tunnel construction. It uses crawler mucking loader for steep slope and large-capacity transport equipment to significantly save the time of load...
  • Undergroud Mine Explosion Option 8
    This option is ideal for level tunnels, vertical shafts or inclined shafts with large cross section. The main feature of this option is that it can make space for tunneling within shortest time....